Site Search: 中文

HOME >> Research Divisions >> Division of Geohazards

Ongoing and Newly Finished Projects

1. Scientific and technological supporting projects, Secondary disaster risk inspection and engineering design,
    2008-2009.


2. Topic 5 of the Ministry of Science and Technology Supporting Program, Technology of Geohazard risk assess-
     ment, 2006-2009.


3. Topic 3 of the Ministry of Science and Technology 973 project, Research on large secondary mountain disaster
     management system of the Wenchuan earthquake, 2008-2010.


4. The National Natural Science Foundation project, Research on slope evolution and large landslide mechanism
     at the boundary of the Weihe Basin in Baoji city, 2009-2011.


5. The National Natural Science Foundation project, Research on mechanism of earthquake-induced large loess
     landslide, 2009-2011.


6. The National Natural Science Foundation project, Comparison and prediction of  the mechanism of rock burst dis-
     aster in deep tunnels under compression and shear, 2007-2009.


7. The National Natural Science Foundation project, Research on stress distribution of  deeply incised valley and the
     mechanism of unload-induced cracks, 2006-2008.


8. The National Natural Science Foundation project, Fractal dimension analysis on complex landslide boundary trajec-
     tory in western Hubei, 2005-2007.


9. The National Natural Science Foundation project, Research on the mechanism and regional rule of loess collapse
     in western Shanxi and northern Shaanxi, 2002-2004.


10. The Project of China Geological Survey, Investigation and assessment on the seismic geoengineeringin the Long-
       MenShan area and adjacent tectonic zones, 2009-2011.


11. The Project of China Geological Survey, Geongineering stability assessment and stress measurement of major
       active faults in Beijing, 2008-2010.


12. The Project of China Geological Survey, Detailed investigation on geohazards in Baoji, 2006-2009.


13. The Project of China Geological Survey, Investigation and assessment on the crustal stability along Yunnan-Tibet
       railway, 2005-2007.


14. The Project of China Geological Survey, Investigation and assessment on the crustal stability of Qinling-Dabashan
       region for the Three Gorges water diversion project, 2003-2005.





Copyright © 1999–2010 Institute of Geomechanics, Chinese Academy of Geological Sciences
Address:South Minzudaxue Road No. 11, Haidian District, Beijing, China(100081)
Tel:(86-10)68412303 Fax:(86-10)68422326 ICP Record No.05055765 Beijing,China